工程 實績

1979
1979

萬大成立

WDTC Established

1997
1997

萬大建造第一艘自升式平台

WDTC build first Jack-up Barge

1998
1998

進口鑽機

Imported Christensen Drilling rig

CS 1000 P4

CS 1000 P6

CS 3000 

1999
1999

進行Geobor-S PQ採樣

Conducted Geobor-S PQ Sampling
2000/1350 Meters

2001
2001

進口Vertek Cpt
履帶式鑽機
卡車鑽機

帶數據採集系統

2012
2012

使用 Geobor-S HW 尺寸 600m 進行水平鑽孔

Conducted Horizontal Drilling with Geobor-S HW size 600m

2016
2016

First Wind Farm SI Project (TPC) 台電陸上示範風電場

First Wind Farm SI Project (TPC)Tai-Power onshore Demonstration wind farm

2017
2017

進口PDI SPT分析儀 SK能源租用鑽井船

Imported PDI SPT analyzerRent Drilling Vessel from SK energy

2018
2018

與 JUB 一起進行近岸 SI(Jan del Nur,Orsted)

Conducted Nearshore SI with JUB (Jan del Nur, Orsted)

2019
2019

傳導潮間帶 SI (JDN)

Conducted Intertidal SI (JDN)

2021
2021

進行觀塘海上 SI(WhaleShark)(24BH,724 米深度,50 天)

Conducted Guan-Tang Offshore SI (WhaleShark)(24BH, 724 meters depth, 50days)

2022
2022

深水區 SI in 協和動力裝置(WhaleShark)(21BH 390米深度,30天)訂購Comacchio Drilling Rig GEO305*2 Gouda CPT Crawlwer Rig

Conducted Deepwater area SI in
Hsieh-Ho powerplant (WhaleShark)(21BH 390 meters depth, 30 days)Order Comacchio Drilling Rig GEO305*2 Gouda CPT Crawlwer Rig*1